Partner with us today to bring high-quality industrial steel flooring to global markets — together, we can build a stronger future.

Requirements for New Franchisees

The minimum requirements we ask of prospective franchisees include:

1. Have a business license and a fixed business location/office;

2. Have certain business capabilities or a store website, or can participate in some local exhibitions to promote products;

3. Have certain experience in the construction industry and have certain local customer resources.

Sign Franchisee Benefits

World-Class Support from Day One

1. Authorize exclusive import and local distribution rights, and the factory will no longer appoint other people or companies as local distributors or agents;

2. Provide product samples, the number of samples is 1-2;

3. Use the factory's website to promote products to customers and indicate its dealer status;

4. Provide local customer resources or information to dealers, and do not interfere with sales within the dealer's operating area.

5. Continuously provide product-related information or opinions that help promote products.


Note: Provide the most favorable price, which is lower than the normal trade price;

When the trade volume reaches 1 million US dollars in the year, the factory will give a 1% rebate to the dealer;


Get Free Samples

We can send free samples to satisfy customers' concerns before placing orders, such as

  • Whether the usage conditions are consistent

    Whether the usage conditions are consistent

  • Whether the thickness and size are consistent

    Whether the thickness and size are consistent

  • Testing multiple samples of different categories

    Testing multiple samples of different categories

  • 300 series installation solution

  • 600 series installation solution

Ground reconstruction construction scheme

  • The original floor of the workshop with a wool chisel into a pitted surface

    01

    The original floor of the workshop with a wool chisel into a pitted surface

    In order to better combine the cement and the ground laid in the later stage, the finished hemp surface is cleaned

  • After cleaning, sprinkle a layer of mortar on the hemp surface

    02

    After cleaning, sprinkle a layer of mortar on the hemp surface

    Cement and water into a paste, evenly sprinkle

  • Lay new fine stone concrete (10cm thickness)

    03

    Lay new fine stone concrete (10cm thickness)

    Install the metal floor flat on the newly laid cement floor, and make some cement emerge from the floor holes during installation; Install in place as accurately and quickly as possible during the laying process to avoid excessive water overflow from the concrete (water overflow affects the strength of the floor and is not easy to clean up later)

  • Use dry cement to smooth the overflow cement in the floor holes so that the cement is in the same plane as the floor until the floor surface is clean and there are no gaps in the holes

    04

    Use dry cement to smooth the overflow cement in the floor holes so that the cement is in the same plane as the floor until the floor surface is clean and there are no gaps in the holes

    Items 2,3 and 4 should be carried out at the same time to avoid the difficulty of cleaning the cement after drying

  • Do not work or walk on paved surfaces for a week

    05

    Do not work or walk on paved surfaces for a week

    After the cement is dry, the surface of the floating soil can be swept away and put into use

Workshop Floor Renovation Construction Plan

  • Polish the old workshop floor to make it smooth so that it can better integrate with the old floor.

    01

    Polish the old workshop floor to make it smooth so that it can better integrate with the old floor.

    Clean up after sanding. Make sure there is no dust etc. when gluing to avoid affecting the bonding strength.

  • Drill holes in the laying area according to the location of the floor screw holes.

    02

    Drill holes in the laying area according to the location of the floor screw holes.

    Ensure the success rate of punching.

  • Fill the hole with implosion. And apply glue to the installation area.

    03

    Fill the hole with implosion. And apply glue to the installation area.

    Glue will also flow into the hole for reinforcement

  • Lay the steel floor and tighten the fixing screws.

    04

    Lay the steel floor and tighten the fixing screws.

  • Clean excess glue from the floor surface.

    05

    Clean excess glue from the floor surface.

    During the construction period, due to the characteristics of the glue, some glue will come out, but there is no impact. Just wait for the glue to dry and then clean it.

Installation method

There should leave a gapbetween the two floor wheninstallation,so as to adjust;

Use the rubber or woodhammer hit the floor make surethe floor set in the cement.Add wire mesh wheninstall on the original cementground;

Clearn the extra cementfrom the surface of the floorafter 3 hours,fill up the gapswith cement.

C30 concrete

C30 concrete

Iron floor

Iron floor

FAQ

Read Less