E-mail:hbcaerd@vip.163.com
Material
Stainless steel 304,304 material, with corrosion resistance, non rusting, and beautiful appearance; Galvanized steel plate, not resistant to corrosion, with average rust prevention performance, cheap price and high cost-effectiveness. It also has the same load-bearing and impact resistance performance.
Advantage of material
Parameters
Stainless steel 304 material with a thickness of 1.2mm can meet most usage needs, and can also achieve a thickness of 1.5mm;
Galvanized steel plate 2.0mm can meet most usage needs, and can also achieve 2.5mm;
Metal Flooring List
Customized Solutions
Our metal factory is committed to producing high-quality, customized metal flooring solutions to meet the needs of the construction, industrial, and commercial sectors. With professional expertise and innovative design, we ensure durable, safe, and compliant metal flooring for our clients
Metal Floor Application Scenarios
Metal Flooring Installation Instructions
Ground reconstruction construction scheme
01
The original floor of the workshop with a wool chisel into a pitted surface
In order to better combine the cement and the ground laid in the later stage, the finished hemp surface is cleaned
02
After cleaning, sprinkle a layer of mortar on the hemp surface
Cement and water into a paste, evenly sprinkle
03
Lay new fine stone concrete (10cm thickness)
Install the metal floor flat on the newly laid cement floor, and make some cement emerge from the floor holes during installation; Install in place as accurately and quickly as possible during the laying process to avoid excessive water overflow from the concrete (water overflow affects the strength of the floor and is not easy to clean up later)
04
Use dry cement to smooth the overflow cement in the floor holes so that the cement is in the same plane as the floor until the floor surface is clean and there are no gaps in the holes
Items 2,3 and 4 should be carried out at the same time to avoid the difficulty of cleaning the cement after drying
05
Do not work or walk on paved surfaces for a week
After the cement is dry, the surface of the floating soil can be swept away and put into use
Installation method
There should leave a gapbetween the two floor wheninstallation,so as to adjust;
Use the rubber or woodhammer hit the floor make surethe floor set in the cement.Add wire mesh wheninstall on the original cementground;
Clearn the extra cementfrom the surface of the floorafter 3 hours,fill up the gapswith cement.
The first installation method
on the new foundation (above is the iron floor sectional drawing)
The second installation method
on the original foundation (above isthe iron floor sectional drawing)
C30 concrete
Iron floor
FAQ
QCan you provide test reports?
Test reports are available from raw materials to finished products. Our products are RoHS certified and have patent certificates.
QDo you accept factory inspections?
Yes, we welcome customers to conduct factory inspections at any time. We can also accommodate third-party inspections upon request.
QWhat are the transportation methods?
We collaborate with logistics companies to safely and swiftly match the optimal transportation method, including road, rail, air, and sea freight.