E-mail:hbcaerd@vip.163.com
Galvanized steel plate, not resistant to corrosion, with average rust prevention performance, cheap price and high cost-effectiveness
Product Description
Reduce Maintenance Costs-easy to repairs or replacements necessary due to deterioration or deformation; easy to clean;
Safety use - Smooth, quit surface, reduces dangerous load-spilling bumps and jolts;
Improve transportation efficiency-Industrial trucks and dollies move with less effort, no need worry about heavy transportation crushing the ground;
Saves Money - Low installed cost, no maintenance, and long life.
Customized Solutions
Our metal factory is committed to producing high-quality, customized metal flooring solutions to meet the needs of the construction, industrial, and commercial sectors. With professional expertise and innovative design, we ensure durable, safe, and compliant metal flooring for our clients
Metal Flooring Installation Instructions
Workshop Floor Renovation Construction Plan
01
Polish the old workshop floor to make it smooth so that it can better integrate with the old floor.
Clean up after sanding. Make sure there is no dust etc. when gluing to avoid affecting the bonding strength.
02
Drill holes in the laying area according to the location of the floor screw holes.
Ensure the success rate of punching.
03
Fill the hole with implosion. And apply glue to the installation area.
Glue will also flow into the hole for reinforcement
04
Lay the steel floor and tighten the fixing screws.
05
Clean excess glue from the floor surface.
During the construction period, due to the characteristics of the glue, some glue will come out, but there is no impact. Just wait for the glue to dry and then clean it.
Installation method
There should leave a gapbetween the two floor wheninstallation,so as to adjust;
Use the rubber or woodhammer hit the floor make surethe floor set in the cement.Add wire mesh wheninstall on the original cementground;
Clearn the extra cementfrom the surface of the floorafter 3 hours,fill up the gapswith cement.
The first installation method
on the new foundation (above is the iron floor sectional drawing)
The second installation method
on the original foundation (above isthe iron floor sectional drawing)
C30 concrete
Iron floor
FAQ
QDo you provide after-sales service?
Yes, our after-sales service includes, but is not limited to, damage repair, component delivery, and regular maintenance.
QWhat are the transportation methods?
We collaborate with logistics companies to safely and swiftly match the optimal transportation method, including road, rail, air, and sea freight.
QDo you accept factory inspections?
Yes, we welcome customers to conduct factory inspections at any time. We can also accommodate third-party inspections upon request.
QCan you provide test reports?
Test reports are available from raw materials to finished products. Our products are RoHS certified and have patent certificates.